QUALITY / INSPECTION CONTROL
NdFeB Magnet Inspection from Incoming Material to Release
Review IQC, IPQC and FQC or OQC checkpoints for custom sintered NdFeB magnets and drawing-led production release.
Drawing-led review preferred. A clear written requirement can start the discussion when a drawing is not ready.
ENGINEERING SNAPSHOTKeep the requirement visible from review to release.
Material and incoming basis
Production checkpoints
Finished part release
Agreed with the requirement
01 / INSPECTION CHECKPOINTS
Inspection follows the part through the route.
Quality control is useful when the checkpoints match the project. Incoming material, process conditions and finished product checks can be connected to the same drawing and specification.
IQC
Review incoming material and documentation.
IPQC
Keep process-critical checks beside production.
FQC / OQC
Confirm finished dimensions, magnetic and surface basis.
Records
Carry results into the agreed release file.
02 / DEFINE THE RELEASE BASIS
State what must be checked before release.
The drawing, application and inspection plan should agree on the dimensions, magnetic performance, coating, appearance and traceability that control acceptance.

Dimensional
Critical dimensions, fit and tolerance.
Magnetic
Grade, direction and project performance target.
Surface
Appearance, coating and condition.
Traceability
Records required to support the handoff.
03 / PROJECT-SPECIFIC QUALITY
Quality is specific to the project.
A quality route should reflect the approved drawing, specification, sample approval and production-lot inspection. It should not turn a conditional capability into a universal promise.

Requirement
Use the latest approved revision.
Sample
Align first-article or sample expectations.
Lot
Confirm the finished production basis.
Release
Keep evidence available for the agreed handoff.
04 / NEXT STEP
Bring quality requirements into the RFQ.
Share the drawing, critical dimensions, magnetic target, coating, appearance and traceability expectations already known.
Prioritize
Identify the checks that control the assembly.
Document
State the record or report expected.
Review
Align the plan before production.
QUALITY / INSPECTION BASIS
Release the part with evidence.
A clear inspection basis makes the manufacturing handoff useful.
Discuss Quality Requirements