ASTROMAGNET Request a Quote

INSPECTION EVIDENCE / QUALITY

How we verify a part.

Quality begins with the requirement. The drawing, grade, coating and magnetization basis define what is checked and what the handoff must show.

Coordinate measuring machine inspection environment
QUALITY BEFORE RELEASE / INSPECTION EVIDENCE BESIDE THE PART.

QUALITY OPENING

Start with the requirement.

The approved drawing and project specification set the inspection basis. When the requirement changes, the evidence needed for release may change with it.

Drawing
Geometry, dimensions, datums and tolerances define the part to be checked.
Material
Grade, temperature context and magnetic target remain tied to the application.
Finish
Surface, coating and environmental context are reviewed with the finished condition.
Handoff
Inspection evidence follows the requirement into the next engineering conversation.

WHAT IS CHECKED

Make quality part of the brief.

The inspection route follows the requirement. Dimensional, magnetic, surface and environmental evidence stay connected to the finished condition and the application context.

01

Product Inspection Report

Dimensions, magnetic values and release judgement from a real inspection report.

02

Magnetic / Hysteresis Curve

Measured magnetic curve and values with identifying report fields removed.

03

Plating Thickness Test

Coating thickness measurements and conclusion from a real test report.

04

Salt Spray Test

Salt spray condition and corrosion result from a real test report.

05

High Temperature Test

Before-and-after magnetic readings under the recorded temperature condition.

06

Drop Test

Drop-test condition and coating adhesion result from a real test report.

CONTROL POINTS

Each check answers a project question.

Inspection is useful when the check is connected to the feature, performance or finished condition that matters in the assembly.

DIMENSIONAL INSPECTION

Does the geometry follow the drawing?

Critical sizes, tolerances and fit-related features are reviewed against the approved requirement.

MAGNETIC PERFORMANCE

Does the part meet the magnetic basis?

Magnetic output is measured with equipment suited to the requirement and the specified part context.

SURFACE / COATING

Is the finished condition suitable?

Surface condition, coating and corrosion context are considered before the part is released.

IN-PROCESS CONTROL

What must stay controlled?

Process checkpoints and the exact inspection record are confirmed against the approved project basis.

HOW THE EVIDENCE TRAVELS

Release with the requirement beside the part.

Inspection evidence can support the handoff from an approved specification to a finished lot. The final release remains tied to the project requirement.

Discuss the quality basis
Requirement
Approved drawing, specification and application context.
Measurement
Dimensional, magnetic, surface or environmental check as required.
Record
Evidence that can travel with the project handoff.
Release
Finished condition reviewed against the defined requirement.

TRACEABILITY / DOCUMENTATION

Evidence for the engineering handoff.

Quality records can connect the approved drawing, inspection basis and finished condition. The exact release package remains project-specific.

  • Approved drawing or written requirement
  • Dimensional, magnetic, surface or environmental evidence as required
  • Finished condition and agreed release notes
  • Batch records where traceability is part of the project

Real inspection environment.

Public-ready equipment photographs show the measurement and environmental context used to support a project review.

Magnetic measurement / Magnetic performance equipment in the inspection environment.
Plating thickness / Coating thickness inspection for the finished surface.
Vision measurement / 2D measurement context for geometry and feature review.
Environmental control / Constant temperature and humidity equipment for environmental review.
Salt spray / Salt spray equipment for corrosion-related project checks.

Quality questions.

Short answers for the first engineering handoff.

What is verified before release?

The agreed basis can cover dimensions, magnetic performance, surface or coating, corrosion and environmental conditions, plus traceability where required.

Can the inspection basis follow a customer drawing?

Yes. The drawing, specification and application context define which checks and records are useful for the project handoff.

What can be included in the quality handoff?

The release package can include the approved requirement, applicable measurements, finished-condition notes and batch records where traceability is part of the brief.

ENGINEERING HANDOFF

Share the inspection basis.

Share the drawing, inspection requirement and application context so the review can identify the evidence the part needs.

Start a quality review
QUALITY BASISDIMENSIONAL
MAGNETIC / SURFACE
ENVIRONMENT
REQUIREMENT / MEASUREMENT / RELEASE